• Home
  • About
  • Advertise
  • Privacy Policy
  • Support Us
  • Contact Us
          MEGHALAYA & NE EDITION
No Result
View All Result
South Asia Views
Meghalya Tourism
  • Home
  • State
  • North East
    • All
    • Arunachal Pradesh
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    Booker Stars, Lakeside Stories: Lit Fest Is Back

    Booker Stars, Lakeside Stories: Lit Fest Is Back

    Hail, Goals And High Drama At Polo

    Hail, Goals And High Drama At Polo

    The Hills Are Drumming Again: Wangala Hits 50 With 1000 Drums

    The Hills Are Drumming Again: Wangala Hits 50 With 1000 Drums

    Rs 151-Cr Shillong Peak Ropeway Not on Sacred Site, Govt Clarifies

    Talk, Don’t Fight: Govt Throws Open Doors On Ropeway

    Ice Falls, Harvest Dies: Shillong’s Sudden Storm

    Ice Falls, Harvest Dies: Shillong’s Sudden Storm

    Chokpot’s ₹162 Crore Day

    Chokpot’s ₹162 Crore Day

    Mendipathar Express: Farm To Market In A Day

    Mendipathar Express: Farm To Market In A Day

    Two Down, Never Out: Mawpat’s Great Escape

    Two Down, Never Out: Mawpat’s Great Escape

    Jal Utsav Turns Shillong Into A Splash Of Culture

    Jal Utsav Turns Shillong Into A Splash Of Culture

    Trending Tags

    • Education
    • National
      Main accused in Guwahati hotel firing case killed

      Main accused in Guwahati hotel firing case killed

      Six killed as helicopter crash lands in U’khand

      Six killed as helicopter crash lands in U’khand

      Massive protest in Delhi against CEC

      Massive protest in Delhi against CEC

      At least 20 killed in Kolkata puja pandal tragedy

      At least 20 killed in Kolkata puja pandal tragedy

      Why Cong lost power? Amit Shah has the answer

      Why Cong lost power? Amit Shah has the answer

      INDIA Bloc files plea in SC against SIR

      INDIA Bloc files plea in SC against SIR

      Jantar Mantar de-notified as protest site

      Jantar Mantar de-notified as protest site

      Metro rail, internet should not be disrupted in Delhi: SC

      Metro rail, internet should not be disrupted in Delhi: SC

      CJP, AISA continues protest in CP

      CJP, AISA continues protest in CP

    • South Asia
      Modi-Putin rendezvous vows boost hopes in key issues

      BRICS Summit pushes for permanent Indian presence in UNSC

      Rangdajied Ride On Micky Magic To Sink Nangkiew Irat

      Rangdajied Ride On Micky Magic To Sink Nangkiew Irat

      Chinese Pres Xi Jinping leaves Delhi

      Chinese Pres Xi Jinping leaves Delhi

      Modi and Xi Jinping stress progress in India-China relations

      Modi and Xi Jinping stress progress in India-China relations

      Nepal’s Himalayan Horror: Glacier Burst Kills 359

      Nepal’s Himalayan Horror: Glacier Burst Kills 359

      13 Nations Train as One in Meghalaya War Games

      13 Nations Train as One in Meghalaya War Games

      Drone attacks in Manipur villages by Burmese militants

      Drone attacks in Manipur villages by Burmese militants

      Banned ULFA -I  not to  call boycott on this Independence Day

      Terror Alert: ULFA Attacks Assam Police, Think Tank Warns of More Strikes

      Osman Hadi Murder: 2 Bangladeshi Suspects Caught in India, Entered via Meghalaya

      Osman Hadi Murder: 2 Bangladeshi Suspects Caught in India, Entered via Meghalaya

    • Business
    • Sports
      Hail, Goals And High Drama At Polo

      Hail, Goals And High Drama At Polo

      Two Down, Never Out: Mawpat’s Great Escape

      Two Down, Never Out: Mawpat’s Great Escape

      State Plans 39 Games For 2027

      State Plans 39 Games For 2027

      Mawpat’s 30-Second Miracle Sinks Nongkrem

      Mawpat’s 30-Second Miracle Sinks Nongkrem

      Mawlai SC vs Lamlynti FC to Kickstart SSA Champions Cup Tomorrow

      Mawlai SC vs Lamlynti FC to Kickstart SSA Champions Cup Tomorrow

      Nongkseh Crush Police to Win Super Cup

      Nongkseh Crush Police to Win Super Cup

    • Opinion
    • Meghalaya Tourism
    • Home
    • State
    • North East
      • All
      • Arunachal Pradesh
      • Assam
      • Manipur
      • Meghalaya
      • Mizoram
      • Nagaland
      • Sikkim
      • Tripura
      Booker Stars, Lakeside Stories: Lit Fest Is Back

      Booker Stars, Lakeside Stories: Lit Fest Is Back

      Hail, Goals And High Drama At Polo

      Hail, Goals And High Drama At Polo

      The Hills Are Drumming Again: Wangala Hits 50 With 1000 Drums

      The Hills Are Drumming Again: Wangala Hits 50 With 1000 Drums

      Rs 151-Cr Shillong Peak Ropeway Not on Sacred Site, Govt Clarifies

      Talk, Don’t Fight: Govt Throws Open Doors On Ropeway

      Ice Falls, Harvest Dies: Shillong’s Sudden Storm

      Ice Falls, Harvest Dies: Shillong’s Sudden Storm

      Chokpot’s ₹162 Crore Day

      Chokpot’s ₹162 Crore Day

      Mendipathar Express: Farm To Market In A Day

      Mendipathar Express: Farm To Market In A Day

      Two Down, Never Out: Mawpat’s Great Escape

      Two Down, Never Out: Mawpat’s Great Escape

      Jal Utsav Turns Shillong Into A Splash Of Culture

      Jal Utsav Turns Shillong Into A Splash Of Culture

      Trending Tags

      • Education
      • National
        Main accused in Guwahati hotel firing case killed

        Main accused in Guwahati hotel firing case killed

        Six killed as helicopter crash lands in U’khand

        Six killed as helicopter crash lands in U’khand

        Massive protest in Delhi against CEC

        Massive protest in Delhi against CEC

        At least 20 killed in Kolkata puja pandal tragedy

        At least 20 killed in Kolkata puja pandal tragedy

        Why Cong lost power? Amit Shah has the answer

        Why Cong lost power? Amit Shah has the answer

        INDIA Bloc files plea in SC against SIR

        INDIA Bloc files plea in SC against SIR

        Jantar Mantar de-notified as protest site

        Jantar Mantar de-notified as protest site

        Metro rail, internet should not be disrupted in Delhi: SC

        Metro rail, internet should not be disrupted in Delhi: SC

        CJP, AISA continues protest in CP

        CJP, AISA continues protest in CP

      • South Asia
        Modi-Putin rendezvous vows boost hopes in key issues

        BRICS Summit pushes for permanent Indian presence in UNSC

        Rangdajied Ride On Micky Magic To Sink Nangkiew Irat

        Rangdajied Ride On Micky Magic To Sink Nangkiew Irat

        Chinese Pres Xi Jinping leaves Delhi

        Chinese Pres Xi Jinping leaves Delhi

        Modi and Xi Jinping stress progress in India-China relations

        Modi and Xi Jinping stress progress in India-China relations

        Nepal’s Himalayan Horror: Glacier Burst Kills 359

        Nepal’s Himalayan Horror: Glacier Burst Kills 359

        13 Nations Train as One in Meghalaya War Games

        13 Nations Train as One in Meghalaya War Games

        Drone attacks in Manipur villages by Burmese militants

        Drone attacks in Manipur villages by Burmese militants

        Banned ULFA -I  not to  call boycott on this Independence Day

        Terror Alert: ULFA Attacks Assam Police, Think Tank Warns of More Strikes

        Osman Hadi Murder: 2 Bangladeshi Suspects Caught in India, Entered via Meghalaya

        Osman Hadi Murder: 2 Bangladeshi Suspects Caught in India, Entered via Meghalaya

      • Business
      • Sports
        Hail, Goals And High Drama At Polo

        Hail, Goals And High Drama At Polo

        Two Down, Never Out: Mawpat’s Great Escape

        Two Down, Never Out: Mawpat’s Great Escape

        State Plans 39 Games For 2027

        State Plans 39 Games For 2027

        Mawpat’s 30-Second Miracle Sinks Nongkrem

        Mawpat’s 30-Second Miracle Sinks Nongkrem

        Mawlai SC vs Lamlynti FC to Kickstart SSA Champions Cup Tomorrow

        Mawlai SC vs Lamlynti FC to Kickstart SSA Champions Cup Tomorrow

        Nongkseh Crush Police to Win Super Cup

        Nongkseh Crush Police to Win Super Cup

      • Opinion
      • Meghalaya Tourism
      No Result
      View All Result
      South Asia Views
      No Result
      View All Result
      Home North East Meghalaya

      Green Pledge in Shillong: Leaders Plant Trees at Meghalaya Legislative Assembly

      Governor Chandrashekhar H Vijaya Shankar emphasized the importance of giving priority to native species during plantations

      Editor by Editor
      July 23, 2025
      in Featured, Flash News, Meghalaya, North East
      0
      Green Pledge in Shillong: Leaders Plant Trees at Meghalaya Legislative Assembly

      Image : CMO, Meghalaya

      343
      SHARES
      2k
      VIEWS

      Shillong ( Meghalaya), July 23 : A tree plantation program was held today, July 23, 2025, at the premises of the Meghalaya Legislative Assembly, Mawdiangdiang, here . The event was organized by the Meghalaya Legislative Assembly in collaboration with the Forest Department.

       

      Governor of Meghalaya Chandrashekhar H Vijaya Shankar, Chief Minister Conrad K Sangma, Speaker Thomas A Sangma, Deputy Chief Minister Prestone Tynsong, Deputy Speaker Timothy D Shira, and members of the Meghalaya Legislative Assembly participated in the plantation program.

      ADVERTISEMENT

       

      Governor Chandrashekhar H Vijaya Shankar emphasized the importance of giving priority to native species during plantations. “Meghalaya is blessed with an abundance of medicinal plants and therefore it is imperative to conserve and protect these medicinal plants especially the endangered species,” he added.

      Previous Post

      Ratan Thiyam, Renowned Indian Theatre Director and Playwright, Passes Away at 77

      Next Post

      High Court Probes Validity of Khasi Customary Law in Landmark PIL

      Editor

      Editor

      Related Posts

      Booker Stars, Lakeside Stories: Lit Fest Is Back
      Meghalaya Tourism

      Booker Stars, Lakeside Stories: Lit Fest Is Back

      by Editor
      November 11, 2026
      Hail, Goals And High Drama At Polo
      Sports

      Hail, Goals And High Drama At Polo

      by Editor
      November 11, 2026
      The Hills Are Drumming Again: Wangala Hits 50 With 1000 Drums
      Meghalaya

      The Hills Are Drumming Again: Wangala Hits 50 With 1000 Drums

      by Editor
      November 11, 2026
      Rs 151-Cr Shillong Peak Ropeway Not on Sacred Site, Govt Clarifies
      Meghalaya Tourism

      Talk, Don’t Fight: Govt Throws Open Doors On Ropeway

      by Editor
      November 11, 2026
      Ice Falls, Harvest Dies: Shillong’s Sudden Storm
      Meghalaya

      Ice Falls, Harvest Dies: Shillong’s Sudden Storm

      by Editor
      November 11, 2026
      Next Post
      Meghalaya High Court receives bomb threat email

      High Court Probes Validity of Khasi Customary Law in Landmark PIL

      State on High Alert: Ramps Up Border Vigilance Amid Assam’s Eviction Drive

      State on High Alert: Ramps Up Border Vigilance Amid Assam's Eviction Drive

      Meghalaya High Court receives bomb threat email

      High Court Grills State Over Amrit Cement's Alleged Illegal Activities

      Leave a Reply Cancel reply

      Your email address will not be published. Required fields are marked *

      USTM, Meghalaya USTM, Meghalaya USTM, Meghalaya

      We’re on Facebook

      Popular Post

      • Rs 151-Cr Shillong Peak Ropeway Not on Sacred Site, Govt Clarifies

        Talk, Don’t Fight: Govt Throws Open Doors On Ropeway

        335 shares
        Share 134 Tweet 84
      • Ice Falls, Harvest Dies: Shillong’s Sudden Storm

        335 shares
        Share 134 Tweet 84
      • Hail, Goals And High Drama At Polo

        334 shares
        Share 134 Tweet 84
      • The Hills Are Drumming Again: Wangala Hits 50 With 1000 Drums

        334 shares
        Share 134 Tweet 84
      • Booker Stars, Lakeside Stories: Lit Fest Is Back

        334 shares
        Share 134 Tweet 84
      Facebook Twitter Youtube Instagram

      About Us

      South Asia Views is the new spokesman of not an endangered world, but that of cosmic fusion, a new bearer of the media and the world wide web. South Asia Views articulates worldviews, seen from new and fresh perspectives, that of single and singular humanity.

      A unit of RC Foundation

      Head office:
      Burnside Compound, Rilbong,
      Shillong -793004,
      Meghalaya, India.
      Phone no : +91 -364 2223616
      Email : viewssouthasia@gmail.com

      We’re on Facebook

      Quick Navigation

      © 2021 South Asia Views. All Rights Reserved. Empanelled to DIPR, Govt. of Meghalaya vide Order No. ML.13/2007/249 dated 16/10/2017

      No Result
      View All Result
      • Home
      • State
      • North East
      • Education
      • National
      • South Asia
      • Business
      • Sports
      • Opinion
      • Meghalaya Tourism

      © 2021 South Asia Views. All Rights Reserved. Empanelled to DIPR, Govt. of Meghalaya vide Order No. ML.13/2007/249 dated 16/10/2017